Design and project management of the campus data center relocation in Ross Hall.  The efforts include all hardware and cabling, HVAC and all environmental control.

Design, bid and implementation management of a VoIP telephone system with ACD and voice mail for the campus.

Designed an 802.11 backbone radio network for Edinboro University of PA. This network will be used to connect building LANS in the event that campus fiber is cut or the data center becomes unusable.

Implementation Management of the $4.5 million Edinboro University/Williams Communications Alliance Project during the summer of 2000.  This project consisted of the wiring of eight residence halls for voice, data and CATV, the installation of a Nortel Meridian PBX, a gigabit local area network built upon a Cisco 6509 Core switch with 4912, 4006 and 4003 edge switches, a CATV Head-End, and the outside cable plant to connect the buildings.  Assisted in the organization and set up of the help desk in addition to the technology.  Created as-built documentation and floor plans for the residence halls and OSP Campus map.


 

Projects Main Page
 





Client's Website
 
Reference Letter
 

 


 

 


www.walczakconsultants.com  ::  projects  ::  edinboro university of pennsylvania